Bob:
Just installed the latest version of TSXPro daily build designed to deal with error 22007 and it appears it has. I got the following failure from scheduler. TSXPro is still working perfectly, no reported error, tracking along just fine. What do you think is happening here?
Peter


02-Dec-2011 00:37:24.7: No pending plans that can be started now.
02-Dec-2011 00:37:24.7: Dispatcher cycle time: 0.011 sec.
02-Dec-2011 00:37:54.8: ConnectWeather(), already connected.
02-Dec-2011 00:37:54.8: SelectRunning: No running plans
02-Dec-2011 00:37:54.8: No pending plans that can be started now.
02-Dec-2011 00:37:54.8: Dispatcher cycle time: 0.01 sec.
02-Dec-2011 00:38:24.9: ConnectWeather(), already connected.
02-Dec-2011 00:38:25.0: SelectRunning: No running plans
02-Dec-2011 00:38:25.0: Efficiency: Only one pending plan ngc 604-Luminesence (1-6), it is the "best"
02-Dec-2011 00:38:25.0: Dispatcher cycle time: 0.0550055 sec.
02-Dec-2011 00:38:25.0: Acquire data for Observation ngc 604...
02-Dec-2011 00:38:25.0: Send Observation ngc 604 to ACP Sequencer
02-Dec-2011 00:38:35.0: Sequencer is now active
02-Dec-2011 01:47:48.7: Sequencer is no longer active
02-Dec-2011 01:47:48.7: Post-job status check done (stat=Completed)
02-Dec-2011 01:47:48.7: Acquisition time: 4163.7038228 sec.
02-Dec-2011 01:47:48.7: Data for Observation ngc 604 acquired successfully.
02-Dec-2011 01:47:48.7: Image Efficiency: 86.5%
02-Dec-2011 01:47:48.7: Cycle Efficiency: 100.0%
02-Dec-2011 01:47:48.8: ConnectWeather(), already connected.
02-Dec-2011 01:47:48.8: ++ Auto Focus ++
02-Dec-2011 01:47:48.8: Doing periodic autofocus.
02-Dec-2011 01:47:48.8: Start special ACP AutoFocus script for scheduler
02-Dec-2011 01:47:58.8: Sequencer is now active
02-Dec-2011 01:49:40.9: Sequencer is no longer active
02-Dec-2011 01:49:40.9: ** Autofocus failed (n=1), will retry ASAP after 0 min.
02-Dec-2011 01:49:40.9: **EXCEPTION IN SCHEDULER:
02-Dec-2011 01:49:40.9: The telescope is not connected.
02-Dec-2011 01:49:40.9: Traceback:
at ACP.TelescopeClass.get_SlewSettleTime()
at DC3.Scheduler.ACPSequencer.get_SlewSettleTime()
at DC3.Scheduler.Engine.CalculateTimeSpans(Plan P, ArrayList OList)
at DC3.Scheduler.Engine.DoSchedulePass()
at DC3.Scheduler.Engine.Run()
02-Dec-2011 01:49:41.2: Run statistics:
02-Dec-2011 01:49:41.2: Observations: 292
02-Dec-2011 01:49:41.2: Considered: 229
02-Dec-2011 01:49:41.2: Completed: 203
02-Dec-2011 01:49:41.2: Skipped: 24
02-Dec-2011 01:49:41.2: Never Eligible: 63
02-Dec-2011 01:49:41.2: Failed: 2
02-Dec-2011 01:49:41.2: Shutter-Open efficiency: 81.55%
02-Dec-2011 01:49:41.2: Overall Efficiency: 99.90%
02-Dec-2011 01:49:41.2: Release ACP sequencer
Log closed at Fri, Dec 02 2011 01:49:42 UTC (actual time)