I thought I saw this mentioned in another post, but I can't find it now. I started a plan this evening to image M78. Before I loaded the plan, I slewed to M78 in ACP, to see if it had cleared the treetops. It had, so I started AcquireImages and loaded my plan.
Even though ACP said it was waiting until the designated start time, it did not turn off sidereal tracking.
I've attached a screen shot and the log to this point (the plan is still running). The plan started at 02:20 in the log.
Isn't ACP supposed turn off tracking while it waits for the #WAITFOR time? I thought this was the case, and I've seen it every time until tonight.
Thanks for any info.
Mike