HI BOB
having problems with getting this to run
HERE IS THE LOG, running maximdl 6.29, SkyX 10.50, just loaded ACP 9.0 onto new Eagle S computer Win 10 and double checked that all other systems are on working without ACP. So, symptoms are that slew begins and are way off. seem to always point south as well. GPS coordinates are confirmed correct on ACP, time and location are correct in skyX as well. Not sure what is going on. Appreciate any help, Bob
CP console log opened 01-Mar-2022 00:28:36 UTC
This is ACP version 9.0 (build 4, ACP 9 Production Release)
Licensed to Robert Fields
00:28:36 Logging to C:\Users\PrimaLuceLab\Documents\ACP Astronomy\Logs\20220228\20220301@002836.log
00:28:37 Initializing AcquireSupport V9.0.3
00:28:37 Telescope is ACP->Driver for telescope connected through TheSky, driver V3
00:28:38 MaxIm DL is version 6.29
00:28:38 Imager is SBIG Universal
00:28:38 Selecting filter Luminance from previous ACP run at 20220227@013228 UTC
00:28:38 Imager readout modes:
00:28:38 0 is Raw
00:28:38 Guider is SBIG Universal (no rotator)
00:28:38 Guider plate scale unknown, guided dither with guider pixels
00:28:38 Max unguided exposure 30 sec.
00:28:38 Calculated unbinned plate scales (arcsec/pix): H = 1.69 V = 1.69
00:28:38 Calculated field of view (arcmin): H = 57.8 V = 57.8
00:28:38 Plate solving with GSC 1.1 (ok for wider fields)
00:28:38 Mount supports tracking rate offsets
00:28:38 All-sky plate solving will be attempted when needed
00:28:38 All-sky service at nova.astrometry.net will be used
00:28:38 This is AcquireImages V9.0.1
00:28:38 Hardware pier side reporting is available.
00:28:38 Compiling plan...
00:28:38 (using ACP Plan Compiler V9.0.1)
00:28:38 ...plan OK!
00:28:38 This plan has 1 live target(s), 3 images
00:28:38 There are 1.5 min. of actual imaging time
00:28:38 Image file set-numbers start with 1
00:28:38 Catalog Maximum Mag = 18.0
00:28:38 Starting run for plan last-plan-from-web.txt...
00:28:40 ==== Starting target M 42 ====
00:28:40 ;
00:28:40 ; Single target color series plan by PrimaLuceLab, created Tue, 1 Mar 2022 00:28:36 UTC
00:28:40 ;
00:28:40 Start slew to M 42...
00:28:45 (wait for slew to complete)
00:29:31 (slew complete)
00:29:31 (request plan-start pointing update)
00:29:31 Ready for M 42 (# 1 of 1 in set 1)
00:29:31 M 42 specifies 3 sets of images.
00:29:33 === Starting filter group 1 of 3 ===
00:29:33 Selecting Blue filter (3) for imaging
00:29:33 Pointing update: Wait and flip if within 120 sec of flip point
00:29:33 [flip check: Tn=420s HAc=4797s GW=T HAz=-17s DWz=F WF=YES]
00:29:33 (GEM must flip before next operation)
00:29:33 [FPw=0s FPe=0s HAt=-437s PFM=300s
00:29:33 (waiting 42462 sec to pass flip limit)
00:29:33 (wait ends at 12:17:15 UTC)
00:29:33 (turning tracking off)
00:29:33 **Script Error (Tracking has been stopped)**
00:29:33 Source: Microsoft JScript runtime error
00:29:33 Message: Overflow
00:29:33 Location: line 3112 column 5.
ACP console log closed 01-Mar-2022 00:29:33 UTC