Hi Bob
I've tried to make sense of this but it's happened now on two different targets so I need help! (BTW where can I get more detail on the flip check calculation? I like to understand things in detail.)
See attached log. ACP determined that a flip was needed when M33 was at an Alt of 24deg 48min and Az 290deg 35min. So first query - why does it want to flip then?
It then calculated a wait of 23663 seconds. Why so long? This prevented the rest of the plan (including dawn flats) from executing.
Thanks
Peter.